Click to go to home page
Advanced Consulting Engineers
Civil Engineering Consultants, Planners

 

 
 
 
 



Awarded as Subconsultant to Prime, City of Austin Projects:
City of Austin Identification Analysis of Flaws in Power Plant Components 2004. City of Austin Survey Rotation List 2003-2005. City of Austin, Shaw Lane, Water and Wastewater System Facility Engineering Rotation List 2008-2011

Completed as Subconsultant to Prime, City of Austin Project:
City of Austin ADA Sidewalk Ramp and Bikeway Improvement Rotation List 2004-2007 Provided ADA related sidewalk curb ramp design services using GIS data and field observation for the installation of ADA accessible sidewalks in proximity to Weberville Road and Pleasant Valley in east Austin.

Some of Our Completed Projects:
US79 Palestine, TX

Provided Microstation CAD support services to Executive Lead Architect/Engineering firm formerly Carter & Burgess currently Jacobs for the creation of the right-of-way maps.

State Highway 45 Southeast
As a subconsultant to Pate-Zachry Engineering Team Provided Microstation related CAD drafting services for the creation of PS&E drawings for the SH45SE turnpike project which is approximately 7 miles east-west connection between SH130 and IH35.

State Highway 130
The State Highway 130 (SH130) project segments 1 to 4 encompasses a 49-mile long toll-way extending between Williamson and Travis Counties from Interstate Highway 35 (I35) north of Georgetown and south towards U.S. 183 (US183) southeast of Austin. We have diligently provided civil engineering services to complete our contractual obligations to DMJM+HARRIS, Inc. SH130 is a four-lane roadway with toll facilities and major interchanges at I35, US79, SH45 North, US290 and SH71. At ACE we have the capability to design a wide variety of highway project, including interstates, urban freeways, arterial and local inventory roads, toll-ways, interchanges, high-occupancy vehicle (HOV) lanes and rural roadways, just like we did on this SH130 project.

Southwest Hills Section 4, US290, Austin
ACE has completed this Single Family subdivision project in a responsible fashion for the overall project management and civil engineering design. The project abuts Derecho Road at US 290 consisting of 27 single family once acre lots. The roadway layout is of a horse shoe configuration with unique City of Austin water quality requirements of re-irrigation techniques to clean filtered runoff. The site is beautifully surrounded by a vast array of undeveloped land and single family subdivisions.

Central Fire Station FM1825, Pflugerville
The Central Fire Station in downtown Pflugerville is sitting on prime location with historical significance incorporating some of the oldest trees in Pflugerville. ACE had sucessfully prepared the engineering plans for the re-grade and re-pave of the Central Fire Station Parking Lot, along with parking striping plan and routing of runoff to the existing detention pond. In the past, the modification to the Fire Station included addition of bays and realignment of the driveways along Railroad and Wren Street.

 

[About ACE] [Services] [Projects] [Career] [Contact]